Kerala State Electricity Board (KSEB) invited bids in Packages 1 and 2 for supply of materials, erection, testing, and commissioning of work construction, conversion and reconductoring of low tension (LT) line using covered conductor rabbit on turnkey basis for the Dyuthi 2.0 Scheme on March 25 and March 28, 2025, respectively.

This content is restricted.