NHPC Limited commenced commercial operations on 107.14 MW capacity under the 1,000 MW Grid Connected Solar PV Power Project (CPSU Tranche-III) in Bikaner, Rajasthan on April 12, 2025. As of now, a total of 138.14 MW capacity has been commissioned under the project.
This content is restricted.