GMR Kamalanga Energy Limited invited bids for design, engineering, supply, and supervision of installation, testing, and commissioning of boiler, turbine, and generator (BTG) for the Kamalanga Coal Based Power Expansion Project on June 23, 2025.
This content is restricted.