Uttarakhand Jal Vidyut Nigam Limited (UJVN) invited bids in two packages: one for drilling and another for drifting works, respectively, for both the 300 MW Lakhwar-Vyasi Pumped Storage Project and the 150 MW Vyasi-Katapathar Pumped Storage Project, on September 16, 2025, and September 18, 2025.

This content is restricted.