Ladakh Power Development Department (LPDD) has extended the bid due date for the selection of solar power developers (SPDs) for setting up a 7 MW/ 9 MWh grid-connected solar photovoltaic (PV) power project with Battery Energy Storage System (BESS) at the 4 MW Stakna Hydel Power Plant on Renewable Energy Service Company (RESCO) mode in Leh district of the Union Territory (UT) from July 12, 2025 to July 31, 2025.
This content is restricted.