NTPC Limited has extended the bid due date for supply and installation of wind turbine generators (WTGs) having rated capacity of 3 MW and above for setting up 672 MW inter state transmission system (ISTS)-connected wind power projects in Solapur, Maharashtra to February 9, 2026.

This content is restricted.