Bridge and Roof Company (India) Limited invited bids for selection of associate for the Balance of System (BoS) package for setting up 600 MW (2×300 MW) Inter-State Transmission System (ISTS)-connected solar power photovoltaic (PV) projects under the South Block of 4,750 MW Khavda Renewable Energy (RE) Park in Rann of Kutch district of Gujarat on October 13, 2025.
This content is restricted.