Ahmedabad Municipal Corporation (AMC) invited bids for the implementation of a 75 MW grid-connected ground-mounted solar photovoltaic (PV) power project with 7.5 MW/30 MWh battery energy storage system (BESS) under the group captive mode in Gujarat on June 12, 2026.
This content is restricted.