Power Grid Corporation of India Limited (PGCIL) invited bids for pre-bid tie-up for Package BESS-04 for setting up 20 MW/80 MWh under the 125 MW/500 MWh standalone battery energy storage system (BESS) projects on build, own and operate (BOO) basis under tariff based competitive bidding (TBCB) mode in Odisha on February 9, 2026.
This content is restricted.