National Aluminium Company Limited (NALCO) invited bids for engagement of consultant to carry out site specific study, preparation of detailed project report (DPR) including power system study for the 1,080 MW (4×270 MW) Angul Expansion Thermal Captive Power Plant (CPP) on June 17, 2025.
This content is restricted.