West Bengal State Electricity Distribution Company Limited (WBSEDCL) invited bids for design, engineering, supply, construction, and commissioning of a 100 MW solar photovoltaic (PV) power project with a 25 MW/100 MWh battery energy storage system (BESS) at Goaltore in the West Medinipur district of the state under Phase-II of the 212.5 MW Ramnagar II Solar PV Project on February 5, 2026.
This content is restricted.