MOIL Limited invited bids for design, engineering, procurement and supply, construction, erection, testing and commissioning, and comprehensive operation and maintenance (O&M) for five years for setting up the 15 MW solar photovoltaic (PV) project with seasonal tilt at Rajgarh Khas in Madhya Pradesh on October 29, 2025.
This content is restricted.