Power Grid Corporation of India Limited (PGCIL) invited bids for engagement of surveying agency for carrying out route alignment, detailed survey, and detailed soil investigation for the Common Transmission System for evacuation of power from Lakadia (Phase-II: 7.5GW), Jam Khambhaliya (Phase-II: 5.5GW) and Jamnagar (Phase-I: 1GW) – Part-B and the Common Transmission System for evacuation of power from Lakadia (Phase-II: 7.5GW), Jam Khambhaliya (Phase-II: 5.5GW) and Jamnagar (Phase-I: 1GW) – Part-C in Gujarat on May 6, 2026.
This content is restricted.