Uttarakhand Power Corporation Limited (UPCL) has invited bids for three clusters for setting up a cumulative 100 MW/250 MWh grid-connected standalone battery energy storage system (BESS) projects on build, own and operate (BOO) basis through charged-based competitive bidding in the state.

This content is restricted.