Bharat Heavy Electricals Limited (BHEL) invited bids for wind tunnel test for chimney of the Raghunathpur Power Project Phase II (SG island package) and the 2×660 MW Koradi Thermal Power Project (boiler, turbine, and generator (BTG) package) on May 22, 2025.
This content is restricted.