Bharat Heavy Electricals Limited (BHEL) invited bids for wind tunnel test of chimney for the Adilabad Coal Based Power Project Stage II and the 1,320 MW Rajiv Gandhi (Korba West) Thermal Power Plant on June 12, 2025.

This content is restricted.