Bharat Heavy Electricals Limited (BHEL) re-invited bids for pre-bid tie up for Balance of System (BoS) package for development of 1,200 MW (2x450MW + 1x300MW) grid-connected solar photovoltaic (PV) power projects at Anantapur, Andhra Pradesh on July 4, 2026.
This content is restricted.