Evolve Green Energies Private Limited won bids for setting up 15 MW grid-connected solar photovoltaic (PV) power project with 15 MW/45 MWh battery energy storage system (BESS) under build, own and operate (BOO) mode through tariff-based competitive bidding (TBCB) process at K. Pitchampatti village in Karur district of Tamil Nadu on March 11, 2026.
This content is restricted.