NHPC Limited commenced commercial operations on 53.57 MW capacity under the Phase-IV of the 1,000 MW Grid Connected Solar PV Power Project (CPSU Tranche-III) in Bikaner, Rajasthan on June 30, 2025. 

This content is restricted.