NHPC commences commercial operations on 31 MW capacity under 1,000 MW Grid Connected Solar PV Power Project (CPSU Tranche-III) in Bikaner, Rajasthan April 4, 2025 | Project Updates NHPC Limited commenced commercial operations on 300 MW capacity under the 1,000 MW Grid Connected Solar PV Power Project (CPSU Tranche-III) in Bikaner, Rajasthan on March 31, 2025. This content is restricted.