Solar Energy Corporation of India (SECI) has issued a Notice Inviting Tender (NIT) for setting up 70 MW Inter-State Transmission System (ISTS)-connected ground-mounted solar photovoltaic (PV) power project with 25 MW/50 MWh Battery Energy Storage System (BESS) at Ramagiri, Sri Sathya Sai District in Andhra Pradesh (Package 1: SOLAR+BESS).

This content is restricted.