NTPC Limited commissioned 37.925 MW capacity under the 300 MW solar power capacity being developed under the 450 MW ISTS-Connected Wind-Solar Hybrid Power Project (Tranche-V) (NTPC) in Khavda, Gujarat on December 18, 2025.
This content is restricted.