NTPC commissions 90 MW wind power project in Bhuj, Gujarat April 9, 2025 | Project Updates NTPC Limited commissioned 90 MW wind power capacity under Phase-I of the 450 MW ISTS-Connected Wind-Solar Hybrid Power Project (Tranche-IV) [NTPC] in Bhuj, Gujarat on April 9, 2025. This content is restricted.