Power Grid Corporation of India Limited (PGCIL) received a Letter of Intent (LoI) through tariff based competitive bidding (TBCB) process on build, own, operate, and transfer (BOOT) basis for the Transmission system for Integration of Power from RE Projects in Jam Khambhaliya REZ in Gujarat – Phase II (5500MW) and Jamnagar Phase-I (1000 MW) on August 21, 2026.
This content is restricted.