Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) invited Request For Selection (RfS) bids for the selection of a developer to set up a minimum 640 MW Pumped Hydro Storage Plant (PSP) using the upper reservoir at Rihand Dam and the lower reservoir at Obra Dam, Sonebhadra district in Uttar Pradesh, on build, own, operate (BOO) mode under tariff based competitive bidding (TBCB) process on February 18, 2026.

This content is restricted.