SLR Infrastructure Private Limited has won bids for Package-II for development of a cumulative 30 MW solar power plants on engineering, procurement and construction (EPC) basis at various locations of the Singareni coal belt in Telangana under the 232 MW Telangana Solar PV Power Projects Phase II (SCCL).

This content is restricted.