A total of ten firms have been shortlisted as technically qualified for setting up 5 MW solar photovoltaic (PV) based grid-connected power projects for a period of 25 years at East Singhbhum districts in Jharkhand. Bids for the same were invited by Jharkhand Renewable Energy Development Agency (JREDA) in September 2024. 

This content is restricted.