A total of three firms have submitted bids for selection of associate for the Balance of System (BoS) package for setting up 600 MW (2×300 MW) Inter-State Transmission System (ISTS)-connected solar power photovoltaic (PV) projects under the South Block of 4,750 MW Khavda Renewable Energy (RE) Park in Rann of Kutch district of Gujarat.

This content is restricted.