A total of three firms have won bids for setting up a cumulative 250 MW Grid-Connected Solar Photovoltaic (PV) Power Projects without energy storage system (ESS) anywhere in India under Phase XXVI of Gujarat Urja Vikas Nigam Limited (GUVNL) on March 6, 2025.
This content is restricted.