Bharat Heavy Electricals Limited (BHEL) has emerged as the lowest bidder (L1) by quoting Rs 56,259.03 million for main power plant (MPP) engineering, procurement, and construction (EPC) package for the 800 MW Durgapur Thermal Power Expansion Project.
This content is restricted.